Backflow Prevention & Cross Connection Control

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

                     DPOR Widget  Backflow Report Widget

Backflow Prevention & Required Annual Testing

Annual testing for all testable backflow devices is required by the Town of Leesburg and the State of Virginia. All testing must be completed by a DPOR certified tester. 

Test results must be submitted to the Town's Utilities Department using this Backflow Test Report Form. A PDF version of the test report form can be found HERE.

Annual residential irrigation system backflow prevention device test results must be submitted to the Town by June 1 every year.

Commercial and residential customers are responsible for submitting annual backflow test results to the Town. If the backflow device fails testing, a passing report must be submitted within 15 days.

Please email to notify us of your backflow device test status, or if you need assistance regarding backflow device testing.

Cross Connection Control Program

The Virginia Department of Health (VDH) Waterworks Regulations requires the Town to have a Cross Connection and Backflow Prevention Control Program.

Inspections are performed on all non-residential facilities connected to the Town’s water supply in order to detect actual or potential cross connections and ensure compliance with requirements. Inspection frequency varies based on hazard level and occur as follows:

  • High Hazard at least annual 
  • Low Hazard every 3-5 years

During inspections, existing cross connection control devices are inspected to determine if the device has been altered, bypassed, removed, or made otherwise ineffective. Once the inspection is completed, the inspector will advise you on next steps, provide a copy of the inspection report, and the inspection fee will be applied to your next quarterly water/sewer bill. Inspection fees are charged based on meter size as listed below:

  • 5/8” Meter $50.00
  • 3/4” Meter $50.00
  • 1” Meter $50.00
  • 1 ½” Meter $75.00

 

  • 2” Meter $120.00
  • 3” Meter $225.00
  • 4” Meter $375.00
  • 6” Meter $750.00

 

 

If you have any questions please contact the Town's Environmental Compliance Inspector at 703-737-7956 or email.