TOWN OF LEESBURG
NOTICE OF PUBLIC HEARING
TO CONSIDER AMENDMENTS TO THE
DESIGN AND CONSTRUCTION STANDARDS MANUAL (DCSM)
an incorporated portion of the
SUBDIVISION AND LAND DEVELOPMENT REGULATIONS OF LEESBURG, VIRGINIA
Pursuant to Sections 15.2-2204, 15.2-2240 et seq., 15.2-2251 and 15.2-2253 of the Code of Virginia, 1950, as amended, the Leesburg Planning Commission will hold a public hearing on:
Thursday, March 21, at 7:00 P.M.
in the Town Council Chambers
25 West Market Street, Leesburg, Virginia, 20176
to consider amendments to the following provisions of the Town’s Design and Construction Standards Manual (DCSM):
- ×Article 4 (Sewage and Solid Waste Disposal), Section 4-130 (Design Criteria)
- ×Article 2 (Fire and Water Regulation Details), Drawings:
Drawing No.
|
Title
|
Drawing No.
|
Title
|
WD-12
|
Conduit Bedding - Waterlines
|
WD-14
|
Water Sampling Station -Installation
|
WD-20
|
Typical Water Main Trench in Rock
|
|
|
- ×Article 4 (Sewage and Solid Waste Disposal Details), Drawings SD-5 (Conduit Bedding – Sewer Lines)
- ×Appendix A (Construction Standards), Article 2 (Water and Fire Regulation (GN-WS Details)), Drawings:
Drawing No.
Title
Drawing No.
Title
GN-1
General Notes (to be deleted and replaced with WN-1)
GN-2
General Notes (to be deleted and replaced with SN-1)
WN-1
Water General Notes (to be created; replaces GN-1)
WS-1
1” Water Service and 5/8”, 3/4”, or 1” Meter
WS-2
11/2” or 2” Water Service and Meter Connection
WS-3
3” and Larger Water and Meter Connection with No Fire Service
WS-4
3” and Larger Water and Meter Installation with No Fire Service
WS-5
Blow-off Fire Hydrant
WS-7
Automatic Air Release Valve
WS-8
1” Manual Air Release
WS-9
2” Manual Air Release
WS-10
Standard Casing Installation
WS-11
Liner Plate Tunnel
WS-15
Strapping
WS-18
Fire Hydrant
WS-21
Permanent 2” Blow Off (Paved Areas)
WS-23
Double Meter Installation
WS-24
Permanent 2” Blow Off (Unpaved Areas)
WS-25
Temporary 2” Blow Off
WS-30
Combined Fire Line and Domestic (1”, 1.5” or 2”) Service Connection
WS-31
Combined Fire Line and Domestic (3” and Larger) Service Connection
WS-32
Notes for Combined Fire Line and Domestic Service Connection
- ×Appendix A (Construction Standards), Article 4 (Sewage and Solid Waste Disposal (SS Details)), Drawings:
Drawing No.
|
Title
|
Drawing No.
|
Title
|
SN-1
|
Sewer General Notes (to be created; replaces GN-2)
|
|
|
SS-1
|
Sanitary Lateral Connection
|
SS-2
|
House Lateral Spur
|
SS-3
|
Lateral for Deep Sewer
|
SS-4
|
4’ Dia. Manhole with Outside Drop Connection
|
SS-5
|
Forcemain Sewage Air Release Valve
|
SS-6
|
Inside Drop Connection
|
SS-13
|
Sanitary Lateral Cleanout
|
SS-17
|
Forcemain Cleanout
|
SS-33
|
Grease Interceptor
|
SS-38
|
Typical Section – Sanitary Sewer Maintenance Access Drive
|
The amendments to Section 4-130 will add a DCSM modification procedure, allowing application for a low-pressure force main for individual residences. The amendments to the water and sanitary sewer details will: ensure quality construction that complies with the latest industry standards; provide clarification; simplify administration & enforcement of field construction; conform the DCSM to current Town and industry standards; and delete detail sheets for facilities no longer needed or required by the Town.
This Design and Construction Standards Manual ordinance amendment application is identified as case number TLENOA-2024-0001. Copies of these proposed amendments to the DCSM are available at the Department of Utilities, 1385 Russell Branch Parkway, Leesburg, VA during normal business hours (Monday-Friday, 8:30 a.m. to 5:00 p.m.), or by emailing your inquiry to utilityengineering@leesburgva.gov.
At this hearing, all persons desiring to express their views concerning these matters will be heard. Persons requiring special accommodation at this Planning Commission meeting should contact the Clerk of Commission at (703) 771-2434 three days in advance of the meeting. For TTY/TDD service, use the Virginia Relay Center by dialing 711.